How We Work With You
Lift Shaft Design Review
Orona Lift Equipment Delivery
Lift Installation
Final Lift Inspection and Acceptance
We review structural calculations and check the dimensional tolerances and vertical alignment of the concrete lift shaft walls. We specify the required pit dimensions and overhead clearance in accordance with EN 81-20.
We import certified Orona lift components directly from Spain and coordinate deliveries to match your construction deadlines and the pace of work on site.
Our certified lift engineers and installers fit the guide rails, install the machine-room-less (MRL) drive system and wire the microprocessor-based lift control panels.
We carry out final tests on the lift’s safety systems, conduct load tests with an accredited inspection body and hand over the complete operating documentation.
Lift Standards and Accessibility
Full Compliance with EN 81-70 Lift Accessibility Requirements
We design lifts for new buildings in Montenegro to meet applicable accessibility requirements for people with reduced mobility. Each design specifies the clear opening width of automatic lift doors, tactile controls and audible floor announcements.
Lift Capacity Planning for Your Building
Tell us how many floors your building has, how it will be used and how much passenger traffic you expect. Our engineers will use these details to recommend the right lift speed and car dimensions.